PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
Design engineering,
supply, installation, testing, commissioning
& trial run
of Desulphurization Plant, on Turnkey
basis at
Pakistan Steel, Bin Qasim, Karachi, Pakistan
Pakistan
Steel invites offers for above work from eligible
foreign firms or through their local agent,
if any, in Pakistan.
Pakistani firms who are eligible to handle the
above mentioned project and registered with
Pakistan Engineering Council in the “No Limit”
category may also participate in EOI.Proof of
experience is prerequisite.
To
facilitate use of indigenous iron ore, which
is high in Sulphur content, Pakistan Steel envisages
to set up a Desulphurization Plant at an appropriate
place along the railway line for transportation
of hot metal, in Ladles from its Blast Furnaces
to 1300 Tons Steel Mixer located at its Steel
Making Department (SMD). The required Desulphurization
Plant should cope with the production of 1.5
million tons/year of crude steel. The requirement
for the Desulphurization Plant would be as under:
Content of Sulphur
at BF out put
0.08 – 0.10 %
Content of Sulphur
at Converter input
0.015 – 0.02 %
Interested firms should submit all
relevant information with EOI:
- The last date for submission of Expression of
Interest (EOI) is 04 weeks from publication.
- EOI received after the above deadline shall not
be accepted and would be returned unopened.
Telegraph/Telex/Fax EOI(s) shall not be accepted.
- The invitation to EOI is
also available at the following websites:
Pakistan Steel’s Site website: www.paksteel.com.pk
PPRA’s website:
www.ppra.org.pk
- Those firms which are qualified by Pakistan Steel
against their EOIs will be informed by ECD
as eligible for obtaining tender documents
on payment of non-refundable fee of Rs. 2500/-
or equivalent US Dollar in shape of pay order
in favour of Pakistan Steel.
- Pakistan Steel reserves the right to accept or
reject any or all EOI(s) as per PPRA rules
and the right for extension in its date.
I/C (ECD) |
| 20-August-2010 |
PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
RESTORATION OF THE EXISTING PLANT, EQUIPMENT
AND FACILITIES OF PAKISTAN STEEL AND EXPANSION
OF ITS PRODUCTION CAPACITY FROM EXISTING DESIGNED
CAPACITY OF 1.1 MILLION TONS PER YEAR (MTPY)
TO 1.5 MTPY (PHASE-I) AND UPTO 3.0 MTPY (PHASE-II)
Pakistan Steel mills is an integrated iron and
steel plant which was established with the techno-economic
collaboration of the former USSR
with a designed capacity of 1.1 million tons
per year (mtpy) of
crude steel. It came into operation in phases
during the period 1981-85.
An
overview of its production facilities is summarized
below:
| Process |
Major
equipment |
Capacity
(000)/ make |
Year
of commissioning |
| Coke making |
§
Two
Coke oven Batteries
§
Dry
Quenching Plant
§
By
Products Plant |
§
970
tpy/USSR
|
§
Battery
1:1985
§
Battery
2: 1981
§
Quenching
Plant:1983 |
| Sintering |
§
Two
Sintering Machines |
§
1,850
tpy/USSR |
§
Commissioned
in 1981 & 1982, upgraded by Voest
Alpine in 1996 |
| Iron making |
§
Two
Blast Furnaces |
§
1,230
tpy/USSR |
§
Furnace
1:1981
§
Furnace
2:1984 |
| Steel making |
§
Hot
metal mixer
§
Two
converters |
§
1,300
tpy capacity
§
1,100
tpy / USSR |
§
Mixer
: 1982
§
Converter
: 1982 |
| Steel Casting |
§
One
4 stand bloom caster
§
Two
2 stand slab casters
§
One
6 stand Billet Caster |
§
275
tpy capacity/ USSR, Czech
§
825
tpy/USSR
§
400
tpy/Austria |
§
Bloom
Casters : 1982
§
Slab
Casters : 1983
§
Billet
Casters : 1989 |
| Hot Rolling Mills |
§
Billet
Mills
§
Hot
Strip Mills (“HSM”) |
§
260
tpy/USSR
§
792
tpy/USSR |
§
Billet
Mill : 1982
§
Strip
Mill : 1983 |
| Cold Rolling Mill
( “CRM”) |
§
Pickling
Line
§
Reversible
Mill
§
Bell
Type Furnaces
§
Temper
Rolling
Mills
§
Cold
Shearing Unit
§
Cold
Slitting Unit
§
Cold
Formed Sections
§
Galvanizing
Unit
§
CSSU |
§
250
tpy/USSR/ France
§
200
tpy/USSR
§
100
tpy/USSR
§
100
tpy/USSR
§
85
tpy/USSR
§
14
tpy/USSR
§
120
tpy/USSR
§
100
tpy/USSR
§
584
tpy/USSR |
§
Cold
Rolling Mills : 1984 |
| Oxygen plant |
§
Two
Cold Boxes |
§
Oxygen:
15,000 N cu m/hr
§
Nitrogen:
9,000
N cu m/hr |
§
Cold
Boxes: 1982 |
| Power Generation Plant |
§
Three
Turbo Generators
§
Three
Turbo Blowers
§
Four
Boilers |
§
55
MW each
§
1,600-2,200
N cu m/min
§
220
t/hr |
§
Generators:1981&1984
§
Blowers:
1981 & 1984
§
Boilers:1981,1982,1984 |
|
| 17-September
2010 |
| CORRIGENDUM
NO.1 PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
RESTORATION OF EXISTING PLANT, EQUIPMENT &
FACILITIES AND EXPANSION OF THE MILL UPTO 1.5
MTPY AND 3 MTPY ON TURN KEY
BASIS AT PAKISTAN STEEL, BIN QASIM, KARACHI,
PAKISTAN
Reference notice inviting EOI published in this
newspaper of 22 Aug 2010, the last date for
submission of EOIs in the office of the undersigned
is 11.00 a.m on 06 Oct
2010.
Other contents of the notice
will remain unchanged.
INCHARGE, ENGINEERING CONTRACTS
DEPARTMENT
|
| 17-September
2010 |
| CORRIGENDUM
NO.1
PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING,
COMMISSIONING & TRIAL RUN OF DESULPHURIZATION
PLANT ON ON TURN KEY
BASIS AT PAKISTAN STEEL, BIN QASIM, KARACHI,
PAKISTAN
Reference notice inviting EOI published in this
newspaper of 22 Aug 2010, the last date for
submission of EOIs in the office of the undersigned
is 11.00 a.m on
06 Oct 2010.
Other contents of the notice
will remain unchanged.
INCHARGE, ENGINEERING CONTRACTS
DEPARTMENT
|
| 08
October 2010 |
|
PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
EXTENSION IN LAST DATE FOR SUBMISSION
OF EXPRESSION OF INTEREST FOR
(i) SETTING UP
DESULPHURIZATION PLANT
AND
(ii) RESTORATION OF
EXISTING PLANT, EQUIPMENT, AND FACILITIES OF
PAKISTAN STEEL & EXPANSION OF ITS PRODUCTION
CAPACITY FROM EXISTING DESIGNED CAPACITY OF 1.1
MILLION TONS PER YEAR (MTPY) TO 1.5 MTPY
(PHASE-I) AND UPTO 3.0 MTPY (PHASE-II)
Pakistan Steel recently invited
Expression of Interests (EOI) for the following
projects:
-
Setting up a
desulphurization plant scope of which
includes design, engineering, supply,
installation and trial run on turnkey basis.
-
Restoration of
existing plant, equipment, and facilities of
Pakistan Steel and expansion of its
production capacity from existing
design capacity of 1.1 mtpy to 1.5 mtpy
(Phase-I) and upto 3.0 mtpy (Phase-II)
2. The notices inviting EOIs for
the above referred projects were published in
national dailies on 22 Aug 2010 and in Metal
Bulletin, U.K., on 06 Sep 2010. The last date
for submission of EOIs was 06 Oct 2010.
3. Subsequent upon the request
from certain firms the Competent Authority has
approved extension in last date for submission
of EOI of subject projects from 06 Oct 2010 to
27 Oct 2010.
4. ISMD may please be
requested to upload the extension in last date
for submission of EOI at the following
websites:
Pakistan Steel’s Site website: www.paksteel.com.pk
PPRA’s website:
www.ppra.org.pk
|
|
|
|
|
| |
|