20-August-2010

PUBLIC NOTICE

EXPRESSION OF INTEREST

FOR

Design engineering, supply, installation, testing, commissioning

&  trial  run  of  Desulphurization  Plant, on  Turnkey  basis   at

Pakistan Steel, Bin Qasim, Karachi, Pakistan

 

            Pakistan Steel invites offers for above work from eligible foreign firms or through their local agent, if any, in Pakistan. Pakistani firms who are eligible to handle the above mentioned project and registered with Pakistan Engineering Council in the “No Limit” category may also participate in EOI.Proof of experience is prerequisite.  

            To facilitate use of indigenous iron ore, which is high in Sulphur content, Pakistan Steel envisages to set up a Desulphurization Plant at an appropriate place along the railway line for transportation of hot metal, in Ladles from its Blast Furnaces to 1300 Tons Steel Mixer located at its Steel Making Department (SMD). The required Desulphurization Plant should cope with the production of 1.5 million tons/year of crude steel. The requirement for the Desulphurization Plant would be as under:

 

Content of Sulphur at BF out put                        0.08 – 0.10 %

Content of Sulphur at Converter input                0.015 – 0.02 %

            Interested firms should submit all relevant information with EOI: 

  • The last date for submission of Expression of Interest (EOI) is 04 weeks from publication.
  • EOI received after the above deadline shall not be accepted and would be returned unopened. Telegraph/Telex/Fax EOI(s) shall not be accepted.
  • The invitation to EOI is also available at the following websites:

Pakistan Steel’s Site website:     www.paksteel.com.pk

PPRA’s website:                             www.ppra.org.pk

  • Those firms which are qualified by Pakistan Steel against their EOIs will be informed by ECD as eligible for obtaining tender documents on payment of non-refundable fee of Rs. 2500/- or equivalent US Dollar in shape of pay order in favour of Pakistan Steel.
  • Pakistan Steel reserves the right to accept or reject any or all EOI(s) as per PPRA rules and the right for extension in its date.

 

I/C (ECD)

20-August-2010

PUBLIC NOTICE

EXPRESSION OF INTEREST

FOR

RESTORATION OF THE EXISTING PLANT, EQUIPMENT AND FACILITIES OF PAKISTAN STEEL AND EXPANSION OF ITS PRODUCTION CAPACITY FROM EXISTING DESIGNED CAPACITY OF 1.1 MILLION TONS PER YEAR (MTPY) TO 1.5 MTPY (PHASE-I) AND UPTO 3.0 MTPY (PHASE-II)

 

Pakistan Steel mills is an integrated iron and steel plant which was established with the techno-economic collaboration of the former USSR with a designed capacity of 1.1 million tons per year (mtpy) of crude steel. It came into operation in phases during the period 1981-85.

An overview of its production facilities is summarized below:

Process

Major equipment

Capacity (000)/ make

Year of commissioning

Coke making

§ Two Coke oven Batteries

§ Dry Quenching Plant

§ By Products Plant

§ 970 tpy/USSR

 

§ Battery 1:1985

§ Battery 2: 1981

§ Quenching Plant:1983

Sintering

§ Two Sintering Machines

§ 1,850 tpy/USSR

§ Commissioned in 1981 & 1982, upgraded by Voest Alpine in 1996

Iron making

§ Two Blast Furnaces

§ 1,230 tpy/USSR

§ Furnace 1:1981

§ Furnace 2:1984

Steel making

§ Hot metal mixer

§ Two converters

§ 1,300 tpy capacity

§ 1,100 tpy / USSR

§ Mixer : 1982

§ Converter : 1982

Steel Casting

§ One 4 stand bloom caster

§ Two 2 stand slab casters

§ One 6 stand Billet Caster

§ 275 tpy capacity/ USSR, Czech

§ 825 tpy/USSR

§ 400 tpy/Austria

§ Bloom Casters : 1982

§ Slab Casters : 1983

§ Billet Casters : 1989

Hot Rolling Mills

§ Billet Mills

§ Hot Strip Mills (“HSM”)

§ 260 tpy/USSR

§ 792 tpy/USSR

§ Billet Mill : 1982

§ Strip Mill : 1983

Cold Rolling Mill

( “CRM”)

§ Pickling Line

§ Reversible Mill

§ Bell Type Furnaces

§ Temper Rolling  Mills

§ Cold Shearing Unit

§ Cold Slitting Unit

§ Cold Formed Sections

§ Galvanizing Unit

§ CSSU

§ 250 tpy/USSR/ France

§ 200 tpy/USSR

§ 100 tpy/USSR

§ 100 tpy/USSR

§ 85 tpy/USSR

§ 14 tpy/USSR

§ 120 tpy/USSR

§ 100 tpy/USSR

§ 584 tpy/USSR

§ Cold Rolling Mills : 1984

Oxygen plant

§ Two Cold Boxes

§ Oxygen: 15,000 N cu m/hr

§ Nitrogen:  9,000 N cu m/hr

§ Cold Boxes: 1982

Power Generation Plant

§ Three Turbo Generators

§ Three Turbo Blowers

§ Four Boilers

§ 55 MW each

§ 1,600-2,200 N cu m/min

§ 220 t/hr

§ Generators:1981&1984

§ Blowers: 1981 & 1984

§ Boilers:1981,1982,1984

17-September 2010
CORRIGENDUM NO.1

PUBLIC NOTICE
EXPRESSION OF INTEREST

FOR


RESTORATION OF EXISTING PLANT, EQUIPMENT & FACILITIES AND EXPANSION OF THE MILL UPTO 1.5 MTPY AND 3 MTPY ON TURN KEY
BASIS AT PAKISTAN STEEL, BIN QASIM, KARACHI, PAKISTAN


Reference notice inviting EOI published in this newspaper of 22 Aug 2010, the last date for submission of EOIs in the office of the undersigned is 11.00 a.m on 06 Oct 2010.

Other contents of the notice will remain unchanged.

INCHARGE, ENGINEERING CONTRACTS DEPARTMENT

17-September 2010
CORRIGENDUM NO.1

PUBLIC NOTICE
EXPRESSION OF INTEREST

FOR


DESIGN, ENGINEERING, SUPPLY, INSTALLATION, TESTING, COMMISSIONING & TRIAL RUN OF DESULPHURIZATION PLANT ON ON TURN KEY
BASIS AT PAKISTAN STEEL, BIN QASIM, KARACHI, PAKISTAN


Reference notice inviting EOI published in this newspaper of 22 Aug 2010, the last date for submission of EOIs in the office of the undersigned is 11.00 a.m on 06 Oct 2010.

Other contents of the notice will remain unchanged.

INCHARGE, ENGINEERING CONTRACTS DEPARTMENT

08 October 2010

PUBLIC NOTICE
EXPRESSION OF INTEREST

FOR

EXTENSION IN LAST DATE FOR SUBMISSION OF EXPRESSION OF INTEREST FOR 

(i) SETTING UP DESULPHURIZATION PLANT 

AND 

(ii) RESTORATION OF EXISTING PLANT, EQUIPMENT, AND FACILITIES OF PAKISTAN STEEL & EXPANSION OF ITS PRODUCTION CAPACITY FROM EXISTING DESIGNED CAPACITY OF 1.1 MILLION TONS PER YEAR (MTPY) TO 1.5 MTPY (PHASE-I) AND UPTO 3.0 MTPY (PHASE-II)

Pakistan Steel recently invited Expression of Interests (EOI) for the following projects:

  •  Setting up a desulphurization plant scope of which includes design, engineering, supply, installation and trial run on turnkey basis.

  •  Restoration of existing plant, equipment, and facilities of Pakistan Steel and expansion of its production capacity from existing  design capacity of 1.1 mtpy to 1.5 mtpy (Phase-I) and upto 3.0 mtpy (Phase-II)

2. The notices inviting EOIs for the above referred projects were published in national dailies on 22 Aug 2010 and in Metal Bulletin, U.K., on 06 Sep 2010. The last date for submission of EOIs was 06 Oct 2010. 

3. Subsequent upon the request from certain firms the Competent Authority has approved extension in last date for submission of EOI of subject projects from 06 Oct 2010 to 27 Oct 2010.  

4. ISMD may please be requested to upload the extension in last date for submission of EOI at the following websites:

Pakistan Steel’s Site website:     www.paksteel.com.pk

PPRA’s website:                             www.ppra.org.pk