PUBLIC NOTICE
EXPRESSION OF INTEREST
FOR
Design engineering,
supply, installation, testing, commissioning
& trial run
of Desulphurization Plant, on Turnkey
basis at
Pakistan Steel, Bin Qasim, Karachi, Pakistan
Pakistan
Steel invites offers for above work from eligible
foreign firms or through their local agent,
if any, in Pakistan.
Pakistani firms who are eligible to handle the
above mentioned project and registered with
Pakistan Engineering Council in the “No Limit”
category may also participate in EOI.Proof of
experience is prerequisite.
To
facilitate use of indigenous iron ore, which
is high in Sulphur content, Pakistan Steel envisages
to set up a Desulphurization Plant at an appropriate
place along the railway line for transportation
of hot metal, in Ladles from its Blast Furnaces
to 1300 Tons Steel Mixer located at its Steel
Making Department (SMD). The required Desulphurization
Plant should cope with the production of 1.5
million tons/year of crude steel. The requirement
for the Desulphurization Plant would be as under:
Content of Sulphur
at BF out put
0.08 – 0.10 %
Content of Sulphur
at Converter input
0.015 – 0.02 %
Interested firms should submit all
relevant information with EOI:
- The last date for submission of Expression of
Interest (EOI) is 04 weeks from publication.
- EOI received after the above deadline shall not
be accepted and would be returned unopened.
Telegraph/Telex/Fax EOI(s) shall not be accepted.
- The invitation to EOI is
also available at the following websites:
Pakistan Steel’s Site website: www.paksteel.com.pk
PPRA’s website:
www.ppra.org.pk
- Those firms which are qualified by Pakistan Steel
against their EOIs will be informed by ECD
as eligible for obtaining tender documents
on payment of non-refundable fee of Rs. 2500/-
or equivalent US Dollar in shape of pay order
in favour of Pakistan Steel.
- Pakistan Steel reserves the right to accept or
reject any or all EOI(s) as per PPRA rules
and the right for extension in its date.
I/C (ECD) |